Support and development for the project “Place&Route design support for ASICs and SoCs in nanometer
Ergebnis
| Auftragnehmer | Angebote | Auftragswert | Zuschlag |
|---|---|---|---|
| 2 | 544000€ | 02.03.2026Vertragsschluss |
Beschreibung
The division Smart Sensing and Electronics (SSE) of Fraunhofer IIS is currently looking for an exprienced contractor who can provide services regarding the design and development of several demanding ASIC- and SoC-Projects in bulk CMOS, FDSOI and GAA nanometer technologies (22 FDSOI, 12, 4 nm). The contractor should provide services on research for Interposer technologies and Interposer-Routing.
Gegenstand des Loses
The work to be performed by contractor is the place and route for digital design parts up to top level based on chip specification, Verilog netlists, SDC synthesis constraint data and physical synthesis floorplans including layout extraction and physical design verification (DRC, LVS). Such work includes definition of the implementation flow and a sufficient documentation of the design implementation.In addition there is work on the Interposer layer in different technologies (silicon or organic) for Chiplet designs to be performed.
•All design and implementation work shall be executed in cooperation betweenIIS and contractor by using Cadence (P&R) and Mentor (DRC, LVS) design software on IISservers via remote or on-site access.
•The work shall be executed partially remote, partially on site based on projects needs
•Cadence design software, technology libraries, standard cella, memory and GPI/O modelaccess as well as IP access will be made available on IIS servers
•Mentor Calibre physical design verification software access will be made available on IISservers
•All design and implementation work shall be carefully documented and reportedbetween project manager and contractor in a montly progress report
•The use of Cadence Innovus, Quantus, 2.5 D tools (P&R) and Mentor Calibre (DRC, LVS) software is mandatory, as well as knowledge about the Cadence AI tools.
•All milestones at the end of each project with contractor’s responsibility will be pre-reviewed by contractor on its own responsibility. The review documentation will bereviewed by IIS and contractor in meetings via internet or at Fraunhofer IIS Erlangen.
•Acceptance criteria: Design flow, implementation documentation and design data baseresults are available on IIS servers, the correct functionality of the layouted designs hasbeen successfully shown in review meetings and meet the expected results of thespecification and project management.
Find more Informations in the Tender Specification
Eckdaten
- Vergabestelle
- Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e. V.Am Wolfsmantel 33, 91058 Erlangen
- Art des Auftraggebers
- Öffentliches Unternehmen
- Erfüllungsort
- ErlangenNUTS DE252
- Verfahrensart
- Offenes Verfahren
- Auftragsart
- Dienstleistungen
- Vergaberegime
- EU-weite Vergabe (oberhalb der EU-Schwellenwerte)
- Rechtsgrundlage
- Richtlinie 2014/24/EU (öffentliche Auftragsvergabe)VgV
- Art der Bekanntmachung
- Bekanntmachung vergebener Aufträge oder Zuschlagsbekanntmachung – Standardregelung
- Geschätzter Wert
- nicht veröffentlicht
- Für KMU geeignet
- nicht angegeben
- Geschäftszeichen
- PR1108975 (wht)
- Veröffentlicht
- abgesendet Di., 03.03.2026, 09:23 Uhr MEZ
- Bekanntmachung
- 21add37c-6222-4e36-a668-61d2eca294a5Version 2
- Verfahrens-ID
- eff7a4fe-4cb8-42d6-9af8-145c46d81e54
- Nachprüfungsstelle
- Vergabekammern des Bundes, Bonnzuständig für Rügen und Nachprüfungsanträge
- Datenformat
- eForms-Bekanntmachungeforms-de-2.0
- Verlängerungen
- höchstens 1Fraunhofer has the option of extending the contract twice for 12 months.
- Geschäftszeichen des Loses
- 0001
Kategorien (CPV)
Verlauf des Verfahrens
- Ausschreibungansehen
- Vergabediese Seite
Quelle Bekanntmachungsservice (oeffentlichevergabe.de) (CC0) · Bekanntmachung 21add37c-6222-4e36-a668-61d2eca294a5, Version 2 · bei uns aktualisiert · Stand