Non-Clinical Toxicology and safety assessment of a small molecule
Angebotsfrist: noch 26 Tage
In order to obtain the confidential document “A_05_AdditionalConfidentialInformation”, the signed CDA “A_01_CDA_small molecule manufacturing .doc” must be submitted. This is a prerequisite for submitting a valid offer. Subcontractors must also sign and submit the CDA. The main contractor is not allowed to pass on the confidential information.
Documents that become part oft he contract and must be completed, signed and enclosed with the offer:
1. A_01_CDA_small molecule manufacturing
2. A_03_Price Schedule
3. A_04_Catalogue A_cirtiera
4. A_05_(AFTER CDA)_AdditionalConfidentialInformation
5. B_01_Data protection
6. C_00_Declaration on Exclusion Grounds
7. C_01_Self-declaration
8. C_02_Declaration_EU sanctions
9. C_03_Questions by applicants
10. D_01_Submission of Tender
11. D_02_Terms and Conditions
12. Project Schedule (according to B_02_Submission of a Project Schedule)
13. manufacturing quality concept (according to B_03_Submission of a manufacturing quality concept)
Documents that become part oft he contract and remain with the bidder:
14. B_00_Cover Letter
15. A_02_Performance description
16. Additional Contractual Conditions
Further documents that must be enclosed with the offer:
17. D_00_Master Service Agreement-Template_20231127 (for information only)
The headline objectives of the present manufacturing project are the use of the deliverables in GLP compliant preclinical toxicology and safety pharmacology studies as well as a phase 1 first-in-human clinical trial. The objective of the project is to manufacture two alternative pharmaceutical dosage forms, sterile liquid and semi-solid, to enable dosing as i.v. infusion and topical administration, respectively. This solely relates to current lack of clinical target validation and the requirement to ready the technology for proof-of-mechanism in systemic versus skin administration. We are targeting a virulence factor of S. aureus that may cause pulmonary or dermal infections.
HZI wishes to commission the following activities under Master Service Agreement to a suited contractor. A Go/ NoGo milestone is set after scope 1 while the tendering process and resulting contract shall comprise SCOPE1, SCOPE2, and SCOPE3 activities so as to assure these can be offered in the most economical way in terms of price and quality from one legal entity.
SCOPE1: process development and non-GMP manufacture of drug substance and injectable drug product to enable preclinical efficacy, pharmacokinetic and explora-tory tox/safety studies in preclinical animal models
SCOPE2: process scale up to GMP manufacturing of drug substance and drug product to perform regulatory preclinical tox and safety studies (GLP compliant) as well as a GCP-compliant phase 1 first-in-human clinical trial for the sterile liquid dosage form and infusion administration
SCOPE3: development of the semisolid dosage form for preclinical and phase 1 clinical administration via the topical route
Small Molecule Contract Manufacturing Services
Angebotsfrist: noch 26 Tage
Quelle Bekanntmachungsservice (oeffentlichevergabe.de) (CC0) · Bekanntmachung 1d4f9bdc-c05c-46b2-9f03-4a8306430b9b, Version 1 · bei uns aktualisiert · Stand